01 — Overview

What this protocol is for

This protocol prepares ponds to prevent Early Mortality Syndrome (EMS) by suppressing Vibrio spp. It applies to both earthen and plastic-lined ponds. Follow the correct cleaning steps for your pond type in Step 1. Post-stocking feed supplementation with ViGuard*L is included.

Primary Objective

Suppress Vibrio spp. through disinfection and bioremediation, establish a stable microbial community, and support early post-stocking survival.

02 — Indications

When to use this protocol

Earthen and plastic-lined ponds in EMS-prone areas or with prior Vibrio history, both White Shrimp and Tiger Shrimp.

Important Notes

  • !

    This protocol covers both earthen and plastic lined ponds. Follow the correct initial cleaning steps for your pond type.

  • !

    Do not use antibiotics or pesticides during culture.

  • !

    Do not use lime, dolomite, or zeolite with this system.

  • !

    Water exchange is not recommended. Top up with treated water only.

03 — Procedure

Step-by-step instructions

  1. 1

    Drain and clean pond

    Earthen ponds: drain completely, remove all sludge and debris, and sun dry for 7 to 10 days until cracks appear. Plastic lined ponds: drain, remove sludge with soft tools, and clean all biofilm from walls.

  2. 2

    Incoming water disinfection

    Disinfect pond water with AlphaSep at 1 to 2 ppm (10 to 20 kg per hectare). Leave for 1 day.

  3. 3

    Activate and distribute VibriGo

    Dissolve VibriGo with sugar at 5 kg per hectare. Aerate in a shaded area for 4 hours. Distribute evenly using paddlewheel aerators.

  4. 4

    VibriGo application: 3-day schedule

    Apply VibriGo for 3 consecutive days. Day 1 at 500 g per hectare. Days 2 and 3 at 250 g per hectare. Keep aerators running at all times.

  5. 5

    Mineral and phytoplankton establishment

    At the same time, dissolve MinGro at 1 ppm (10 kg per hectare) and FytoGro at 1 ppm (10 kg per hectare). Spread in front of the aerator.

  6. 6

    Alkalinity correction

    One to two hours later, apply AlkaSet at 1 ppm (10 kg per hectare). Repeat for 2 to 3 consecutive days until Secchi disk reads 50 cm.

  7. 7

    Secchi check: FytoShade if overbloom

    If Secchi disk is still above 50 cm after 7 to 10 days from the first FytoGro application, apply FytoShade at 250 to 500 g with aerators running.

  8. 8

    Stock 1 day after FytoShade

    Stock 1 day after FytoShade application.

  9. 9

    Post-stocking feed supplement

    After stocking, add ViGuard*L at 3 to 5 mL per kg of feed daily. Mix with Guar gum at 1 g per kg of feed. Coat feed evenly. Air dry for 30 minutes before feeding.

04 — Parameters

Key parameters to monitor

Parameter

Target / Range

AlphaSep (water disinfection)

1 to 2 ppm (10 to 20 kg per hectare)

VibriGo: Day 1

500 g per hectare

VibriGo: Days 2 and 3

250 g per hectare

MinGro

1 ppm (10 kg per hectare)

FytoGro

1 ppm (10 kg per hectare)

AlkaSet

1 ppm (10 kg per hectare), 2 to 3 days

Secchi disk target at stocking

50 cm

FytoShade trigger

Secchi above 50 cm after 7 to 10 days

ViGuard*L (post-stocking)

3 to 5 mL per kg of feed daily

Guar gum (post-stocking)

1 g per kg of feed

DO (pond bottom)

at least 3 to 4 ppm

05 — Products

Products used in this protocol

Each product name links to its Blue Aqua product page for specifications and purchasing.